The Fabrication Company logo
Heavy Industrial Infrastructure

Quality Assurance & Testing Laboratory

Every sliding gate and structural module is fully pre-assembled in the factory and tested with its motor drive before packing in bubble wraps.

Machine Parameters

Rated Capacity:100% Pre-Dispatch Gate & Structure Inspection
Working Bed / Enclosure:Inspection before every dispatch
Guaranteed Precision:ISO 9001 Certified Company

Engineering Capabilities & Features

01

ISO 9001 certified quality system

02

Weld, size and finish checks on every job

03

Pre-assembly test fitment before dispatch

What We Check Before Anything Leaves the Factory

We are an ISO 9001 certified company, and quality control is built into each stage rather than left to the end. After cutting we check dimensions against the drawing; after welding we check diagonals, flatness and weld quality; after coating we measure film thickness and inspect for runs or bare spots.

Automated gates are assembled with their running gear and, where possible, tested with the motor before dispatch. Doors are checked for lock alignment and smooth swing.

Every project is photographed before dispatch so you can see the finished item, and our installation team re-checks alignment on site at handover.

Technical FAQs

Quality Assurance & Testing Laboratory — FAQs

Do you test gates before delivery?

Where possible, sliding gates are pre-assembled with their running gear and tested with the motor before dispatch.

How do you check coating thickness?

With a digital dry-film thickness gauge on multiple points of each item.

Will I see the finished item before installation?

Yes — we share pre-dispatch photos on WhatsApp for your approval.